New building
Aquadelta voor van der Kamp
On the first of April, 2022, the waterinjection dredger Aquadelta has been launched successfully from the shipyard in Wartena. The ship has been built in close cooperation with van der Kamp. The ship is very well maneuverable because of the installed dynamic positioning.
With an unlimited sailing area and its optimal dimensions (2.3 m draught), the vessel is ideally suited for performing dredging work on the shallowest waterways and in the largest seaports (27 m dredging depth). The Aquadelta is Zero Emission prepared, has the cleanest engines and is equipped with a Green Passport.